
The tile on your roof lasts 50 years. The felt under it doesn't.
Tile roof repair, underlayment replacement, foam recoats, new roofs, monsoon and hail damage and emergency tarping across Surprise and the West Valley. We lift tiles and look before we quote, and the price is written down before a tile moves.
The line is answered day and night · Free inspection with photos · Itemized written price, good for 30 days
Is it the tile, or the felt?
Signs we see on West Valley roofs, and what they usually mean.
- Stain shows up after the first monsoon rainFelt cracked along the laps
- House built 1996 to 2008, never re-feltedUnderlayment at or past 20 years
- Tiles out of line near the ridgeWind lift or rusted fasteners
- Foam roof chalky, small blistersRecoat is due
- Daylight in the attic at a ventFailed pipe jack or flashing
Roofing built around tile, foam and 111 days over 100°F
Roof repair & leaksCracked tiles, split pipe jacks, worn valley metal and blistered foam, traced from the attic and fixed once.
Tile underlayment replacementYour tile comes off, new synthetic underlayment and flashings go on, your tile goes back. The job most Surprise roofs need between year 18 and 25.
Foam & flat roofsRecoats every 5 to 10 years keep a Sun City foam roof going for decades; blisters and ponding fixed.
Monsoon & hail damageLifted ridges, haboob debris and hail-cracked tile, documented to the storm date.
24/7 emergency roof repairTarped tonight, repaired in daylight, any hour of the monsoon season.
Roof replacementNew concrete or clay tile, architectural shingle or new foam when it really is time to start over.
Roof insurance claimsPhotos, a storm report and a line-item estimate before you file. The deductible is always yours.
Roof inspectionsFree storm checks, resale reports, and an honest "come back in five years" when that's the answer.
Where your neighborhood is on the 20-year clock
Surprise went from 30,848 people in 2000 to about 175,000 today, and most of it went up in one burst between 1996 and 2008: Sun City Grand, the Reems Road subdivisions, Surprise Farms, Sierra Montana and Marley Park. Nearly all of it is concrete tile over felt, and felt in this heat lasts about 20 to 25 years.
Build years are the subdivisions' original construction spans. A roof that was already re-felted, or that had synthetic underlayment from the start, runs on a longer clock; a free inspection tells you which one you have.
From the Original Town Site to Sun City Grand and the whole northwest Valley
We are across Surprise every week: the older homes of the Original Town Site, Sun City Grand north of Bell, Kingswood Parke and Ashton Ranch along Reems and Litchfield, Surprise Farms, Greer Ranch, Marley Park and Sierra Montana out toward the White Tanks.
Four things that keep the phone ringing





A tile town at 1,385 feet
- 111
- days a year over 100°F, with a July UV index of 11
- 7 in.
- of rain a year, most of it in monsoon downpours between mid-June and September
- 150–190°F
- under the tile on a summer afternoon, which is what ages the felt
- 1996–2008
- when most of the city's roofs went on
We look first, write every line, and tell you when it's fine
We lift tiles and check the felt before we quote. Every line of the price is written down: tile handling, underlayment, flashings, a broken-tile allowance, the permit when the city requires one and the HOA paperwork when Marley Park or Sun City Grand asks for it. When a roof only needs a few tiles reset, that is the quote you get.
From first call to finished roof in four steps
Call or send the form
A stain, slipped tiles, a storm date or a roof that's just old. The phone is answered around the clock.
Free inspection with photos
Tiles lifted at the eaves and valleys, the attic checked, and the felt shown to you, including when the answer is "it's fine."
Written, itemized price
Every line priced and good for 30 days, with nothing hidden in a lump sum.
Done in days, swept clean
A lift-and-relay on a single-story takes two or three days, then a magnet sweep, gutters cleared and before-and-after photos.
Questions Surprise homeowners ask
My tile roof is 20 years old and looks fine. Why do I need anything?
Because the tile isn't the roof. Concrete tile lasts 40 to 50 years, but it's the underlayment beneath it — the felt or synthetic membrane nailed to the deck — that actually keeps water out, and in Surprise's sun a felt underlayment is done in 15 to 25 years. The tile shades it, the heat cooks it, and it turns brittle and cracks while the roof still looks perfect from the street. Most of Surprise was built between 1996 and 2008, so Sun City Grand, Kingswood Parke, Mountain Vista Ranch, Ashton Ranch and the early Surprise Farms streets are all at that mark now. The fix is a lift-and-relay: we take the tile off, replace the underlayment and flashings, and put your tile back.
How much does it cost to replace the underlayment on a tile roof?
In the West Valley in 2026, a lift-and-relay runs about $4 to $6 per square foot of roof with a good synthetic underlayment — roughly $8,000 to $12,000 for a typical 2,000 square-foot single-story in Surprise, more for a two-story in Marley Park or a cut-up roof with lots of hips and valleys. That includes removing and stacking the tile, new underlayment, new flashings and pipe jacks, replacing broken tiles and re-setting everything. It's a fraction of a new tile roof because you keep your tile.
Do I need a permit to re-roof in Surprise?
Usually not for like-for-like work. The City of Surprise adopted the 2024 building codes on January 1, 2026, with a local amendment that exempts re-roofing with the same type of material — so a tile underlayment replacement, a shingle-over-shingle up to two layers, and a foam recoat are all permit-exempt. Changing the material (tile to shingle, adding foam over a different roof) or touching the structure or decking is not exempt, and we pull the permit from the Building Safety Division when it's required. Your HOA is a separate approval and we handle that paperwork too.
Is my roofer licensed in Arizona?
They should be. Arizona requires a Registrar of Contractors license for any roofing job over $1,000 in labor and materials, or any job that needs a permit — residential roofing is class R-42. Ask any roofer for the license number before they climb, make sure it is on the contract, and check the license, bond and complaint history in about a minute on the ROC's contractor search.
Can you cover my deductible after a monsoon storm?
No, and Arizona law says we can't offer to. A.R.S. 32-1158.02 bars a roofer from advertising or promising to pay, waive or rebate any part of your deductible on a storm-repair contract, and from negotiating your claim with the insurer — that's for licensed adjusters. We document the damage with dated photos and a storm report, meet your adjuster on the roof, and build to the scope your carrier approves. You pay your deductible; everything else is the approved work.
Do you really answer at night?
24 hours a day, every day, including the middle of a monsoon storm. If a microburst has stripped tiles at 11 PM and rain is coming through a ceiling, call. The phone is answered, a tarp goes over it, and the real cause gets found in daylight.